Rescuers search for workers trapped by fire at hydroelectric facility in north

A fire has broken out in a tunnel at a pumped hydroelectric storage power plant located near the Belvoir Fortress in northern Israel.

Four firefighting crews are trying to get into the smoke-filled tunnel to search for five people thought to be trapped inside.

Smoke rising from a pumped storage hydroelectric facility at Belvoir Fortress in Israel on December 13, 2021. (Screen capture)

The tunnel, being constructed and operated by Hong Kong-based firm Hutchinson, is designed to produce some 344 MW/H of power hydroelectric power. The project reportedly involved 5.5 kilometers (3.4 miles) of tunnels dropping 450 meters (1,476 feet) between two dams, which will use gravity and rushing water to create electricity.

The installation is located at the Belvoir Fortress National Park overlooking the Jordan river south of the Sea of Galilee.

Belvoir Fortress in northern Israel, February 3, 2018. (Anat Hermony/Flash90)

 

Most Popular
If you’d like to comment, join
The Times of Israel Community.
Join The Times of Israel Community
Commenting is available for paying members of The Times of Israel Community only. Please join our Community to comment and enjoy other Community benefits.
Please use the following structure: example@domain.com
Confirm Mail
Thank you! Now check your email
You are now a member of The Times of Israel Community! We sent you an email with a login link to . Once you're set up, you can start enjoying Community benefits and commenting.